Project Stakeholder
SEYNTEX
EPC in production site Seyntex – Belgium
Facility and Initial Situation
Facility
- Five buildings with net floor area 34,108m² comprising administration buildings, a textile production site as well as logistics buildings.
Initial Situation
- Production site in which the processes have been regularly modified, but the supporting infrastructure has not been optimised accordingly.
- Office building with out-of-date heating system.
- Logistics buildings (storage) recently refurbished.
Goals and Measures
Goals of building owner
- Maintain/improve production quality
- Reduce CO2 footprint
- Obtain information on specific energy use
- Ensure profitability
Measures
- Isolation of hot oil circuit
- Adjustment of regulation of oil heating system (demand driven)
- Relighting
Facts
Installation of energy efficiency measures |
2016 |
Duration of the contract |
Confidential |
Investment |
184,055 € |
Energy costs 2014 (Baseline) |
541,587 €/a |
Guaranteed savings in Euro |
25,000 €/a |
Guaranteed savings in % |
5 % |
Reduction of CO2 emissions |
128 t/a |
Innovations and Client’s Advantage
- Reduction of CO2 emissions, less offset needed
- Advantages in public tenders
- Detailed info on specific energy use (e.g. kWh per m textile processed)
- Less energy cost
Picture: © Seyntex